Vinyl PVC Outside Corner

Score: 5.00 (votes: 4)
No reviews.

PVC Outside Corner 3/4” square, in white, 8ft long.

  • CAD$7.57
Quantity:  
OR
PayPal Payment Opt. USD Only*
  • Vinyl Wainscoting How To

    Detailed installation instructions

  • SKU
    PVC-OC-8-W
  • Weight
    8 lbs

PVC Outside Corner 3/4” square, in white, 8ft long.

    • SKU
      PVC-OC-8-W
    • Weight
      8 lbs
  • Production Time
    Quick Ship
  • Tarrif Code
    3925.90.0000
  • Shipping Cost
    Ships free on orders over $300 (Vinyl Beadboard components), or contact us for a quote.
    Limitations to our Shipping Specials

INSTALLATION INSTRUCTIONS FOR VINYL WAINSCOTING

“Perfect Finish” Ready-to-Install PVC/Cellular Composite Wainscot * NO PAINTING REQUIRED!

Its made from high strength PVC materials. This material works like wood: cuts, glues or nails. However it will not splinter or crack and has no knots. This product has a lifetime warranty on rot. The product is for interior use only.

Tools:  Mitre Saw or Hand Saw, Hammer, Level, Square, Caulking Gun, Tape Measure, Pencil

[image 1 ]
Additional Materials
Panel Adhesive (PL Premium or No More Nails Tub Surround), 1’’ finishing nails or brad nails (Optional)Installation Tips

Use a quality panel adhesive and follow manufacture’s instructions. When tapping panels into each otheruse a wood block or end cut of one of the panels. Do NOT use the hammer directly on the panel or butt panels too tighly. Allow for normal expansion and contraction (1/32").

For better holding strength angle all nails and drive nails leaving 1/8” above surface and finish using a nailset. When possible nail into moulding groove. This avoids surface damages. For cleaner cut, saw into the finished surface.

When you approach an outlet, turn off the power. Take careful measurements of the outlet location and cut out the opening.

Installation: Base Trim

Measure your wall, if your wall is longer than 8’ pre-mitre the joining end with the next piece of base board you will be using.
[image 7 ]

Make certain the Base Trim has the pre-grooved end up before glueing or nailing. Apply glue in a zig-zag pattern on back of Base Trim and apply to wall. Make sure Base Trim pieces align on the wall
[image 2 & 3 ]

Installation: Panel

The correct installation of the first panel board is the key to an easy and successful installation.

Begin at the left most corner of your installation (opposite if you are left-handed). Each panel is tongue and grooved for a uniform fit and easy installation. Determine which side you want to enhance your room beaded or smooth. Keep the groove edge towards the starting corner. Using a level make sure the first panel is absolutly square. When necessary, scribe and remove material from the panel from the groove

side (inside corner).

[image 4 ]

Next, determine the height you want for your wainscot and cut only if necessary.

[image 5 ]

Do not force fit pieces together. Apply glue on back side of panel place into groove on Base Trim and position into corner.
[image 6 ]

(Optional) Nailing the top, middle and bottom tongue every 16” will ensure better adhesion.Carefully measure and fit next panels. The last panel may also need to be trimmed to fit into the corner.

Installation: Chair Rail

Make sure that all panels are correctly installed.Measure your wall, if your wall is longer than 8’ pre-mitre the joining end with the next piece of Chair Rail you will be using.
[image 7 ] Make certain the Chair Rail has the pre-grooved end down before glueing or nailing.

Apply glue in a zig-zag pattern on back of Chair Rail and apply to wall. Make sure Chair Rail pieces align on the wall.
[image 2 & 3 ]

Maintenance

Cleaning your Vinyl Millwork with a damp cloth makes it look like new.

Customer reviews
Average rating:
5.00 (Votes: 4)
Rating of votes (4)
5
 
4customers
4
 
 
0customers
3
 
 
0customers
2
 
 
0customers
1
 
 
0customers
 
There are no comments yet. Be the first to leave a comment
Please sign in to add review

Related products